Wednesday, 01.07.2009, 03:28pm (GMT-7)
  Home
  FAQ
  RSS
  Links
  Site Map
  Contact
 
Obama approaches Indian for US surgeon general ; Pak enemy is terrorism, not India: ISI chief ; Pak poses threat to India, US: Hadley ; England cricket captain, coach quit ; Marks & Spencer closing stores, cutting 1,230 jobs
::| Keyword:       [Advance Search]
 
NAVIGATION  
  Bollywood
  Community Post
  Health Science
  Horoscope
  Immigration
  India
  Life Style
  Perspective
  Philosophy
  Real Estate
  Sports
  TechBiz
  Travel
  US News
  ::| Poll
Will Indian-American lobby work on terrorism?
Yes
No
Can't say
 
  ::| Newsletter
Your Name:
Your Email:
 
 
 
India
 
World's 2nd largest airport terminal in Delhi
Monday, 11.17.2008, 12:03am (GMT-7)

NEW DELHI: India can boast of having the second largest airport terminal in the world when the third terminal building at the Indira Gandhi International airport here comes up in 2010.

The terminal building alone will come up on 20 acres of land, with the entire seven-storey structure providing a total space of about 5,20,000 square metres and having a capacity of handling 34 million passengers a year.

The Terminal-3 or T3 of IGI airport would be the second largest after the new terminal at the Beijing airport, constructed before the recent Olympics, which has a total floor area of 9,86,000 square meters.

Giving details of the mega project underway at the Delhi airport, CEO (Airport Development) of Delhi International Airport Limited (DIAL) I Prabhakar Rao said: "Our focus is on three Ms -- men, material and machinery.

That is helping us giving shape to this major project." In an interview to PTI, he said several factories were functioning at the project site, producing materials ranging from concrete and steel pipes to air-conditioning ducts.

"Almost a thousand trucks bring in bulk materials like steel, stones and bricks every night to the site, without disturbing traffic anywhere on the near by national highway."

Maintaining that it was a "challenge" for DIAL to complete the mega project in the stipulated time of 37 months, Rao said major airports like Changi in Singapore took 76 months for completion, while Heathrow's T5 and Beijing's new terminal took 60 months.

IGI Airport's T3, which would be able to handle the largest aircraft Airbus A-380, is expected to be completed by March 2010, ahead of the Commonwealth Games.

About 24,000 workers belonging to 44 contractors are working day and night to build the integrated terminal which will cater to 34 million domestic and international passengers every year. Also, on the 24X7 job are about 100 foreign experts, who are racing against time to meet the deadline.

PTI

        Print        Top                       


Other Articles:
Former Minister Ajit Panja dead (11.17.2008)
Sikh devotees in Pak for Guru Nanak birthday (11.17.2008)
Taslima Nasreen 'forced' to leave India again (11.16.2008)
Song of India -symbol of fine dining experience (11.16.2008)
Obama's win extraordinary journey, says PM (11.10.2008)
 
  ::| Events
January 2009  
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
 
::| Hot News
Pak enemy is terrorism, not India: ISI chief
Marks & Spencer closing stores, cutting 1,230 jobs
Foreign and Home affairs go to women in Hasina's cabinet
PoK 'PM' forced out of power in no-confidence vote
Pakistan using terrorism as State Policy: PM
Pak dismisses evidence as 'not credible'
Proof provided by India insufficient, says Pak
Boucher assured of action in case of ‘credible evidence’
Pak hackers plan attack on Indian cyber networks
India gives evidence to Pak on Mumbai terror attacks

Contact us:
(510) 429 - 2110
[Top Page]