Tuesday, 07.08.2008, 07:49pm (GMT-7)
  Home
  FAQ
  RSS
  Links
  Site Map
  Contact
 
Mulayam Singh set to ; Ackerman urges speeding up the Nuclear deal proceedings ; Sikh arrested, turban snatched by State Marshals in courthouse ; Fremont blogger arrested in Singapore ; NY Sikhs march to protest against hate crimes
::| Keyword:       [Advance Search]
 
NAVIGATION  
  Bollywood
  Community Post
  Health Science
  Horoscope
  Immigration
  India
  Life Style
  Perspective
  Philosophy
  Real Estate
  Sports
  TechBiz
  Travel
  US News
  ::| Poll
Is India to blame on Doha stalemate?
Yes
No
Can't Say
 
  ::| Newsletter
Your Name:
Your Email:
 
 
 
TechBiz
 
Fast Breeder Reactor by 2010: Kakodkar
Monday, 04.30.2007, 04:09am (GMT-7)

NEW DELHI: India's indigenous prototype Fast Breeder Reactor (PFBR) that can produce 500 megawatts of power at rates cheaper than existing atomic reactors will begin functioning by 2010.

The PFBR, which will remain outside the purview of IAEA inspectors under the proposed civilian nuclear deal with the US, is being built at Kalpakkam in Tamil Nadu and the construction work is progressing as per schedule. "Work on the PFBR is on schedule and we expect it to be completed by 2010," Atomic Energy Commission Chairman Anil Kakodkar told reporters here. The PFBR will produce electricity through the recycling of plutonium and depleted uranium recovered from the spent fuel of pressurized heavy water reactors.

The technology will allow the nuclear power generation capacity to grow to around 350,000-mw independent of any additional uranium availability. Right to reprocessing of the spent fuel from future reactors is one of the contentious issues in the negotiations on the 123 Agreement to operationalise the civilian nuclear deal with the US.

"The unique feature of this reactor is that it produces more fuel than it consumes, thus reducing power generation costs," Kakodkar said. The reactor is expected to supply electricity to the State grid at Rs. 3.22 a kilowatt hour (kwhr) or 'unit'. Advanced reactors can produce electricity at Rs. 2 a kwhr. India plans to establish four more nuclear fast breeder reactors to cater to the increasing energy needs. The prototype is being built with an investment of Rs 3,500 crore approximately. Of the other four reactors in the pipeline, two would be built at Kalpakkam and two elsewhere.

The future reactors are expected to deliver electricity at even lesser cost. Construction work on the first two of the future FBRs will begin in 2011 and will be completed in 2017. Kakodkar said the pre-licensing review of the Advanced Heavy Water Reactor (AHWR) has been completed by the Atomic Energy Regulatory Board and preparation of the project report was being done. The construction on the indigenously developed AHWR is expected to begin this year. A brain child of Kakodkar, the thorium-based AHWR will be a technology demonstrator reactor and take about five to six years to complete.

The reactor, which will cost between Rs five and six crore per mega watt, has a life span of 100 years and has several innovative safety measures. India has a four-phased roadmap for utilization of thorium resources which includes development of AHWRs, Compact High Temperature Reactor and an accelerator driven fast breeder reactors. India has thorium reserves to the tune of 2.25 lakh tonnes which have an electricity potential of 1.55 lakh Giga Watt Year (GWe-yr).

PTI

Comments (0)        Print        Tell friend        Top


Other Articles:
IISc alumni organizing unique gathering of scientists (04.30.2007)
India Inc goes on an acquisition spree (04.03.2007)
NRIs turn bullish on Indian equity (04.03.2007)
Mittal, Ratan Tata on Barron's list of best CEOs (03.28.2007)
Govt raise FDI ceiling in telecom to 74 pc (03.25.2007)
PhoneSuites exceeds its sales projections (03.25.2007)
Indian ties up with pvt firm for first MRO in India (03.25.2007)
India playing key role in online world: Dell (03.20.2007)
Corus shareholders approve Tata Steel offer (03.12.2007)
India overtakes Japan in number of billionaires (03.12.2007)



 
  ::| Events
July 2008  
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    
 
::| Hot News
India badly hit by global meltdown
TATAS SET TO BAG JAGUAR & A UK BANK

Contact us:
(510) 429 - 2110
[Top Page]